Passion Meets Purpose

Built for progess, designed for possibility

What began as a mission to optimise power amid evolving tariff structures and stricter regulations has now become a powerhouse of innovation.
Beginning of a Power Era
Cospower Engineering Limited was founded in the year 2004 by industry veterans Mr Oswald D’souza and Mr Felix Kadam, and 2 decades later has emerged as a force to be reckoned with, providing ‘Reactive Power Compensation’ and ‘Power Quality Improvement’ to industries across the globe.
Our passion for solving ‘power quality puzzles’ became the foundation of Cospower Engineering and is gaining momentum with each step we take.
We pride ourselves on providing tailored solutions for Harmonics and Power-Related Issues in an Electrical System, based on both technical and economic requirements.
The Core Expertise at Cospower Engineering remains Power Quality and Power Factor Improvement. Still, we have successfully diversified into related activities, including turnkey works of Capacitor Bank and Harmonic Filter.

We manufacture LT APFC, LT RTPFC panels, HT Fixed Capacitor, HT APFC panels and all types of Passive Harmonic Filters. Our manufacturing unit also has the facility to manufacture equipment mounting structures, tower structures and all types of substation structures.

Cospower Engineering has been ranked as one of the top manufacturers in India, specialising in Reactive Power Compensation and Power Quality Improvement solutions tailored to meet the diverse needs of our clients.

Our USP is supplying capacitor banks up to 220kV, including all associated equipment.

Our Motto, “Striving to Enrich Power”, forms the basis of every job we undertake, and the results are reflected in our growing list of satisfied clients.
2004
Est. Cospower Corporation
2009
Completed our largest EPC job for 132 kV.
2014
Introduced LTSVC
2020
  • Successful IPO launch, Cospower turns public.
  • Constructed State-of-the-Art facility for Capacitor Manufacturing. 
2024
Type tested 975 kVAR @ 13.5 kV single unit at CPRI, Bengaluru

Milestones

Cospower Engineering: Milestones 2004 to 2025
2007
Undertook major turnkey projects & substation equipment
2010
Est. Cospower Engineering Pvt Ltd. (CEPL)
2018

Started manufacturing of HT /LT capacitors

2023
  • LT Reactor Manufacturing.
  • Commissioned our first Solar Renewable Project.
  • Tested and supplied 1273 kVAR @ 12.8 kV for a transformer testing with a bank rating of 137 MVAR.
2026
  • Crossed the 100 crores milestone.
  • Acquired land of 150000 sq.ft for a State-of-the-Art new factory with cutting edge technology manufacturing unit.
Kefitup